Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h01/mnt/202863/domains/lielectrical.com/html/wp-content/themes/flex/framework/theme-options/inc/ReduxCore/extensions/customizer/extension_customizer.php on line 291

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h01/mnt/202863/domains/lielectrical.com/html/wp-content/themes/flex/framework/theme-options/inc/ReduxCore/extensions/customizer/extension_customizer.php on line 304

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h01/mnt/202863/domains/lielectrical.com/html/wp-content/themes/flex/framework/theme-options/inc/ReduxCore/extensions/customizer/extension_customizer.php on line 330

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h01/mnt/202863/domains/lielectrical.com/html/wp-content/themes/flex/framework/theme-options/inc/ReduxCore/extensions/customizer/extension_customizer.php on line 342

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nfs/c11/h01/mnt/202863/domains/lielectrical.com/html/wp-content/themes/flex/framework/theme-options/inc/ReduxCore/extensions/customizer/extension_customizer.php on line 361
Case Studies - Long Island ElectricalLong Island Electrical

Macy’s Herald Square

We designed and built a custom power distribution system as part of a $400 million top-to-bottom remodel of the iconic Macy’s store.

Download the case study >>

Radio City Music Hall

We developed a strategy for weighing the lobby chandeliers and delivered electrified hoists at a far lower cost than the alternative.

New York Downtown Hospital

We upgraded aging BAC towers with an innovative in-place installation that eliminated the need to dismantle the old system. Download the case study >>

Grand Central Station

We did the primary electric service for the East Side Access project to bring Long Island Railroad into Grand Central Station.

East Brunswick Water

We replaced a wound rotor motor with a state of the art VFD drive and designed controls to fit into the existing cabinets. Download the case study >>

Second Avenue Subway

We developed custom switchgear to exacting code specifications and delivered it to the prime contractor.

The Viscardi Center

We did a turnkey energy-efficient lighting upgrade. Download the case study >>

Water Pressure Emergency

We help a customer resolve a pressure booster pump failure that was impacting 7 buildings and 2,100 families.

Bethpage Library

We reduced cost by 33% on a major lighting upgrade. Download the case study >>


Emergency Onsite Repairs

We rectified equipment problems and helped a major project to stay on track.

Hurricane Sandy

We get key systems back online within 48 hours. Download the case study >>